Skip to content

Beta โ€‹

Unscheduled. Code name Beacon. Follows Alpha. Wider invite list, more venues, merchant partnerships running end to end.

Beta gets a date when Alpha reaches its Run phase (operator, 2026-08-31: Alpha took the Summer 2027 slot). Bucketed, not phased until then. Every item carries a deferral reason, the condition that would promote it.

Phase 2: Safety (Beta) โ€‹

TaskCategoryPriorityDescriptionWhyStatusIssues
Advanced safety featuresSafety, Eng๐ŸŸ ย P1Whatever Alpha and Beta show is missing, SOS included if warrantedDeferred until evidence says it is neededโฌœ Not started#128, #130
Safety locationsSafety, Business๐ŸŸ ย P1Venues or organizations as safe waypoints, staff trained accordinglyNeeds outside organizations and funding, and Alpha runs without itโ“ Needs operator input#631, #129
Venue certificationsSafety, Business๐ŸŸกย P2Recognize venues whose staff hold relevant safety trainingOnly means something once there are enough venues for a tier to matterโฌœ Not started#630

Phase 3: Analytics and attribution (Beta) โ€‹

TaskCategoryPriorityDescriptionWhyStatusIssues
Attribution, POS pathAnalytics, Eng๐Ÿ”ดย P0Barcode scan or equivalent where a merchant has POS integrationNeeds merchants running a POS we can integrate with, which Alpha's one or two pilot venues will not haveโฌœ Not started

Built with VitePress